Before & after photos: stunning Victorian kitchen/dining extension in Walthamstow - 52 Pembroke Road E17

AE4 Build took on this exciting renovation and extension in Walthamstow, East London and transformed an outdated kitchen and separate, lonely dining room into a modern kitchen/dining space almost the twice the size of the original area.

What the client wanted & how we delivered


The homeowners wanted a contemporary yet functional revamp that would look fantastic and provide a more liveable space. The old kitchen was cramped, dark and dated, and the dining room was underused in a separate room. Both rooms were disconnected with little natural flow.


The family wanted more room and natural light, and to be able to cook and eat together instead of being split between two separate rooms.


The resulting extension almost doubled the footprint of the original kitchen/dining area with sunshine flooding the space through new skylights and Crittal doors opening onto the garden.


The decor is both minimalist and industrial with striking textural contrasts between the exposed brick wall, a new parquet floor and fitted-kitchen cabinetry in a soft gloss. Two different styles of pendant lights mark out the kitchen and dining zones: brushed brass lamp shades in one area and exposed filament bulbs in another, giving a warm vintage glow.


Here’s how the our AE4 Build team did it:


Overall project

  • Free construction management

  • Free project management

  • Advice on Building regulations requirements

  • Handled all Building Control paperwork

  • Full liaison with Thames Water for new sewer connection

  • Ensured planning regulations were met


Interior building work

  • New roof lights, upgraded windows & new Crittal doors installed

  • Full electrical rewiring

  • Lighting

  • Plumbing

  • Roof lights

  • Plastering

  • Painting


Exterior building work

  • Foundations for extension

  • Roof and building structure for extension

  • New manhole for new access to sewers

  • New connection for Thames Water services

  • Cladding

  • Exterior lighting



Keeping things on track


The project took just 20 weeks, with the AE4 Build team on-site every day to keep things moving along smoothly. 


The team provided free construction management to ensure all the building materials arrived on time as they were needed.  


AE4 Build also provided free project management which included repeated liaison with Building Control. We also managed to process of gaining approval from Thames Water for a new connection requiring a new manhole and access to the sewer.

The client's review 


"We found Ahmmad to be reliable, honest, provide a high standard of work, and be good value. You can’t ask for much more than that. We used him for two separate projects (rear extension and loft) and were very happy both times."

- Simon Rogers Nov 2020

Project statistics

1 November 2019

Date project complete

20

Length of project (weeks)

Project Gallery

Read about other projects recently completed by Walthamstow construction contractor AE4 Build, and get in touch to help us make your building dreams become reality.

Glamorous Bathroom Renovation East London.png

Don't miss out on reading about our future projects

Thanks for signing up.

bottom of page